Jeg har uploadet budgetterne over power, vægt, etc fra sidste møde. Den er lagt op i Excel 95 format.

Jeg er iøvrigt studset over et par ting, som kan have generel interesse:

A. Fra Cubesat design specifications (march 2001):

pkt 11: There must be a time delay between release from the P-POD and any CubeSat deployment activity. (several minutes)

pkt 12: For beacon transmitters, there must be a time delay between CubeSat release and the activation of the transmitter. (many minutes to an hour)

pkt 13: CubeSats with rechargeable batteries must ave remote transmitter shut-down capabilities. (hvad det så end betyder?)

Iøvrigt udløses antennerne normalt ved at man brænder en nylontråd over.

B. Cubesat paper (SSC00-V-5)

afsnit 4.1.3: De bruger en PIC16C77, som bruger 40mA under normal brug; men pga strålingen øges strømforbruget til 180mA lige inden den dør - ca. faktor 4,5.

De prøvede iøvrigt også at bestråle de enkelte dele af processoren, når det gik ud over watchdog timeren holdt den op med at virke, så de var nødt til at bruge en ekstern watchdog (MAX824).

Jeg ved ikke om obc gruppen er klar over det?